Friday, October 26, 2012

Cuba part 2

                                Sept. 23 0900hrs

Greetings,

    The sun has risen on what looks to be another beautiful day. No rain on the horizon this morning.
    We’ve enjoyed our coffee on the aft deck and now it’s time to start morning chores. The water maker got caught up on production so this morning we’ll be getting the rest of the salt from the trip off.
    Ooh, dolphins off the starboard side. That makes me smile.

                                    1720hrs
    We went to Playa Serena this afternoon. It’s a bar/restaurant on the beach where they take the day-trip-snorkelers. They have two dolphins in a pen there and, while it was exciting to them that close, it made me sad for them. I’m pretty sure they’re not born in captivity and shouldn’t be held for the tourists to gawk at. It was much better to see the ones swimming beside Second Star this morning.

                                Sept 24 1620hrs
    I went for a swim around the boat this afternoon. It felt good to be in the water. The temp was great for me. I didn’t get cold but it was refreshing in the heat of the day. There were lots of sea stars, a huge conch shell (I didn’t pick it up to see if there was anything living in it), and what looked to me like the biggest hermit crab ever.
    Other than that I’ve spent a good bit of the day reading. Aahh, this is the life.

                                Sept 25 1550hrs
    We’re getting ready to leave Cayo largo and head for Casilda. We’ve checked the weather online and it looks good (not great, but good). We’re planning on leaving at about 0400 to get in there in the afternoon. Early to bed tonight.

                                Sept 27 Noon
    We’re in Casilda now. We arrived later than we’d hope yesterday after fighting the current all the way here. We got in right at sunset and got anchored just before it got dark. We came into the marina this morning and are still wait to be checked in.
    We had a little adventure getting Hook aboard to head out. After having lifted her about half way the relay switch on the davit failed so Capt Johne had to bi-pass the switch so we could finish bringing her up. Then, when he’d gotten it going again, the outer covering (Not the strength part) on the line that she was hanging from ripped and started to jam up in the pulleys so, while I held the dinghy to keep it from swinging, Johne cut the covering off the line being very careful not to cut the core. Anyway, we got her aboard and we have new line to replace the damaged one. We’ll have to go with the bi-passed wiring until a new (although this one was new) relay switch can be acquired.
    We’ll be here for a couple of days, then we’re planning on heading into the Jardines de la Reina. More to come…

No comments:

Followers